Zoning · September 17, 2026 · Steven Owen

Austin TOD vs. ETOD: the two transit zoning systems, and which one your property is in

Austin has two separate transit zoning systems, they were adopted nineteen years apart, and they do different things. The TOD districts came from the 2005 TOD ordinance and cover three station areas on the MetroRail Red Line — Plaza Saltillo, Martin Luther King Jr. Boulevard, and Lamar Boulevard/Justin Lane — each governed by its own adopted Station Area Plan and regulating plan. The ETOD overlay and its DBETOD density bonus came from City Council on May 16, 2024 and apply to non‑single‑family property generally within a half mile of the Project Connect light rail Phase 1 alignment and the Priority Extensions, offering up to 120 feet of height within a quarter mile and 90 feet between a quarter and a half mile in exchange for income‑restricted affordable housing or a fee in lieu. Owning property near a train does nothing for you. Being inside one of these mapped districts, with the right base zoning, is what changes value.

System one: the TOD districts (2005)

Austin’s City Council adopted the TOD ordinance in May 2005, before a single MetroRail train ran. It set up a two‑phase structure: first designate a TOD type for each station area and apply interim regulations, then adopt detailed Station Area Plans that replace those interim rules. Station Area Plans were prepared for the three Neighborhood Center TOD districts — Plaza Saltillo, Martin Luther King Jr. Boulevard, and Lamar Boulevard/Justin Lane (commonly called Crestview/Lamar).

The Lamar/Justin station area is the one that matters most on the north side. It covers portions of three neighborhood planning areas — Crestview, Brentwood and Highland — and the TOD ordinance described it as generally bounded by Grover Avenue, Guadalupe Street, Morrow Street and Denson Drive, including properties with mixed use, commercial or office zoning. Its regulating plan, most recently updated in April 2025, is built on Subchapter E of the Land Development Code and then tailors the standards to the station area: which subdistrict a parcel is in, what uses are permitted by right, how buildings meet the street, parking minimums and maximums, and what height is available.

Two things about this system surprise owners. First, it is parcel‑specific and plan‑driven, not a radius. Being four blocks from Crestview Station does not put you in the district; the regulating plan map does. Second, the TOD districts predate and are independent of the light rail program. They hang off the existing Red Line commuter rail, which has been running since 2010.

System two: the ETOD overlay and DBETOD (2024)

Equitable Transit‑Oriented Development is the newer and much larger program, built around Project Connect. Council approved ETOD Overlay Phase 1 on May 16, 2024. The overlay applies to non‑single‑family properties generally within one‑half mile of the Project Connect Austin Light Rail Phase 1 alignment and the Priority Extensions. Inside the overlay, property can be rezoned into the DBETOD combining district — a density bonus.

The trade is explicit. In exchange for income‑restricted affordable housing, or a fee in lieu, a project gets additional height, modified site development standards including relief from compatibility, and the ability to add residential uses where the base zoning would not allow them. Height is banded by distance:

DBETOD subdistrictRoughlyMaximum heightWhat you give
Subdistrict 1Within ¼ mile of the Phase 1 alignment120 feetAffordability requirement tiered to the height taken — 60’, 90’ or 120’
Subdistrict 2Between ¼ and ½ mile90 feetSame tiered structure at the lower ceiling

For a small older property this is frequently the whole ballgame. Compatibility standards — the rules that step buildings down near single‑family zoning — have historically been what actually limits height on Austin infill sites, more than the zoning district’s stated maximum. Relief from compatibility inside an ETOD combining district can unlock far more than the headline number suggests.

How to tell which one you are in

TOD district (2005)ETOD overlay / DBETOD (2024)
Tied toMetroRail Red Line station areasProject Connect light rail Phase 1 and Priority Extensions
WherePlaza Saltillo, MLK Jr. Blvd, Lamar Blvd/Justin LaneGenerally within ½ mile of the alignment
Applies toParcels shown on the adopted regulating planNon‑single‑family property in the mapped overlay
MechanismStation Area Plan plus regulating plan, on Subchapter ECombining district rezoning with a density bonus
What you getTailored use, form and parking standardsHeight to 90’ or 120’, compatibility relief, residential uses
What you giveCompliance with the regulating planIncome‑restricted units or fee in lieu, tiered by height

A property can sit in one, both or neither. Parts of north‑central Austin near Crestview and Highland are in an adopted TOD station area and in line for ETOD treatment as the Priority Extensions push the light rail program north along the North Lamar and Guadalupe spine. That overlap is exactly where the mispricing lives, because most owners — and plenty of agents — treat “near the train” as one undifferentiated idea.

What this is worth, and what it is not

Be precise about what these programs give you. They give you the right to apply for something better than your base zoning allows, on stated terms. They do not give you an entitlement, a site plan approval, a utility commitment, or a guarantee that a bonus program will look the same in five years. A buyer underwriting an ETOD site is pricing an option, and options are priced on probability and time, not certainty.

What they do change, reliably, is who the buyer is. A 1970s walk‑up with in‑place studio rents is worth what its rent roll supports to a small‑balance income buyer. The same building on a parcel that can be rezoned to 90 or 120 feet is worth what the land supports to a developer, and those are different numbers arrived at by different math. Recognizing which asset you actually own is the entire job. We work through a real example in selling on land value, not rent roll, and the timeline that drives it in what Project Connect actually does to what you own.

Practical steps for an owner

Pull three things before you form an opinion about your property. Your base zoning, because DBETOD is a combining district layered on a base — and the ETOD overlay excludes single‑family property. Your distance to the alignment, measured to the adopted Phase 1 alignment or Priority Extension, because the quarter‑mile line is the difference between 120 feet and 90 feet. The regulating plan, if you are inside one of the three TOD station areas, because that document and not the zoning map controls use, form and parking. Then get a real read on what a developer would pay for the resulting envelope, which is a market question, not a code question.

How SCORE helps

Steven Owen is an Austin commercial real estate Agent who reads the code before the comps. SCORE maps zoning, overlays, TOD and ETOD status, and transit distance for every parcel in its Central Texas database, and represents owners of small and mid‑size infill property who need to know whether they are selling a building or selling a development site — because marketing it as the wrong one leaves money on the table. See development land and recent transactions.

Is your property in a TOD or ETOD district?

Send us the address. We’ll confirm the base zoning, the overlay status, the distance band, and what the resulting envelope is worth to a developer today.

Talk to Steven Development land

Sources and dates: City of Austin TOD ordinance (adopted May 2005) and Station Area Plans for Plaza Saltillo, Martin Luther King Jr. Boulevard and Lamar Boulevard/Justin Lane; Regulating Plan for the Lamar Blvd./Justin Lane TOD Station Area Plan (April 2025); City of Austin, Equitable Transit-Oriented Development (ETOD) Overlay Phase 1, case C20-2023-004, approved by City Council May 16, 2024, including DBETOD subdistrict height limits of 120 feet and 90 feet and height-tiered affordability requirements. Overlay boundaries, subdistrict assignments and bonus terms are amended over time and must be confirmed for a specific parcel with the City of Austin Planning Department. This is general information, not legal, zoning or investment advice. Related: Austin light rail and land value · Selling on land value, not rent roll · Austin multifamily cap rates · What multifamily developers look for.